DIFFERENCES IN WORKMANSHIP DESIGN AND PRACTICES

I like to talk about workmanship practices, quality of materials, and design philosophy. Under workmanship practices all hinge flaps and screws are hidden except the barrel of the hinge. Hidden hinges denote an elegant approach to any construction by caring about your technique and installation. And yes it costs more. The aesthetic gain is well …

OIL FINISHES FOR TEAK

In preparing for oil finishes I use Daly’s Seafin “Ship N Shore” penetrating oil before any other finishing. After sanding I apply a soaking coat and wait 30 minutes before applying a second coat. The first coat is usually absorbed entirely. The second coat sits on the surface mostly and makes sure that all areas …

FINISHING TEAK PART 1.5

Finishing teak will be discussed next after the applications of Ship N Shore. First the sealing coats must be dry. This is easily detected with the palm of the hand touching the wood surface. If the first impression is a coolness to the touch then it can go another day of drying. The assumption is …

DOOR INSTALLATION

Pierrick of VintagePlantations.com chocolate, and very good chocolate, wrote of his door installation as follows: Mike; Monsieur Mike of the doors…. I received the doors and all the accessories in perfect condition. Thank you. The strand board door would not fit properly in its grove, because of the boat imperfections. Geometry is never followed to a “t” …

Inlays For Tables

Artwork Below

  • 8" Compass Rose $375.00
  • 10" Compass Rose $475.00
  • 12" Compass Rose $675.00
  • 18" Compass Rose $995.00
  • 24" Compass Rose $1275.00
  • 4 Point Cardinal $175.00
  • 8 Point Cardinal $350.00
  • Anchor $1600.00
  • Special Designs at 8" $375.00

    Mermaids, Nautilus, Seahorses

  • Ursa Major $300.00
  • Ursa Minor $300.00

    Includes North Star